SERVICES / QA & QC

Quality built into release.

Inspection is most effective when requirements are translated into the purchase route before manufacturing begins.

Discuss the requirement ↗
PlanningITP / QAP / hold points
VerificationVisual / dimensional / NDT
TraceabilityHeat / item / packing list
RecordsMTC / reports / data book

01 / PLAN

Define evidence before production.

The specification is reviewed for mandatory tests, witness and hold points, inspection agency involvement, certification type and document format. These requirements are incorporated into supplier communication and schedule control.

02 / VERIFY

Coordinate inspection around the approved route.

Inspection activities may include document review, visual and dimensional checks, witness testing, marking verification, PMI, NDT review and packing inspection, depending on the product and project.

03 / RELEASE

Reconcile the physical package with its records.

Release status should connect the item, heat number, inspection result, material certificate, packing list and document index. Outstanding documentation is made visible before dispatch.

TECHNICAL QUESTIONS

What buyers ask.

What is the difference between EN 10204 type 3.1 and 3.2?+

Type 3.1 is validated by the manufacturer’s authorized inspection representative independent of production. Type 3.2 also involves validation by the purchaser’s representative or an official inspector, as applicable.

Is third-party inspection always required?+

No. It depends on the governing specification, client requirements, criticality and agreed inspection plan.

PROJECT ENQUIRY

Put the package in motion.

Share the project scope, specification and destination. We will structure the questions that matter before sourcing begins.